Report: Workload Report (Project)

Description:
Workload Report
Calculated Time Spent based on a specified Group Level.
(Agregation not possible on Issues attributs
- Time Spent = Sum of entries of Users on the specified period
- Cumulated = Sum of all entries of Users on all issues
- Estimated = Sum of all Initialy Estimated Time
- Remaining Time : Sum of Remaining Estimated Time (entered or deduced)
- Required Time : Cumulated + Remaining Time
- Gap : Engaged - Planned
Report Type:
Report Type (Predefined Group Level)
Display Model:
Define which Template is used to display Report (Hierarchical, Flat, ...)
Start Date: Pick a date
Low limit date of entries. If not specified, begin of month of specified End Date.
End Date: Pick a date
High limit date of entries. If not specified, end of current month.
Category:
Category on which report is generated (Optionnel)
Project:
Project on which report is generated (Optionnel)
Developper:
Developper having entered the time spent
Report Unit:
Report Unit used to display Time Spent
Id. shown:
If selected, the Issue Key is shown (i.e. KAAM-1).
Summary shown:
If selected, the Issue Summary is shown. (Defaulty assumed if Issue Key not shown)